Made for
How it works

Four stops to order.One weekend to install.

Price it in a minute. See it on your own kitchen. Measure in about 45 minutes, and your fronts ship within 10–15 business days.

Not sure Kitmodo works with your cabinets? Can I reface my cabinets? →

White flat-front wall cabinets with long black bar pulls above a kitchen counterWhite slab fronts · black bar pulls

Six stops, start to finish

One of them is a weekend

10–15 biz days to ship

Anywhere in the US

Measure with confidence

A digital tape that reads for you

At a glance

From a priceto a new kitchen.

Start hereCan I reface my cabinets?Four photos from your phone. Two minutes.Can I reface my cabinets? →
  1. 01

    Price It

    Count your fronts

    A minute
  2. 02

    See It

    Your kitchen, new finish

    Two minutes
  3. 03

    Hold It

    Samples, if you want them

    In stock: 1–2 biz days
  4. 04

    Order It

    Measure and check out

    45 minutes
  5. 05

    Shipped

    Every front labeled

    10–15 biz days
  6. 06

    Install

    Paint the boxes, hang the fronts

    A weekend
Ordering

Four stops, one screen,start wherever you are.

The same four stops as the nav overhead. Price it and see it for free, hold a sample if you want one, then measure and order.

Hands holding a sage green sample door against old oak cabinets, with a laptop and phone showing the new kitchen, finish chips and a digital tape measure on the counterPlanning at home
01

Price it

Count your doors and drawer fronts, and your total is on screen.

02

See it

Upload one photo. We send back your kitchen in the finish you’re considering.

Two minutesLearn more →
03

Hold it

Order chips or a full-size sample door and see the finish in your own light.

In stock: 1–2 biz daysLearn more →
04

Order it

Measure with the digital tape and check out. Every number lands in your order.

45 minutesLearn more →

That’s the whole order. Within 10–15 business days, it ships to your door.

Then it shows up

Everything’s in the box,ready for install day.

One shipment of four or five labeled cartons, with everything you need to finish the job.

Kitmodo cabinet refacing kit cartons on a kitchen counter with stacks of new fronts, pulls, screws and the install guideOne labeled shipment
01

Your fronts

Doors, drawer fronts and false fronts, cut to your measurements and labeled to their exact cabinet.

Made to measureLearn more →
02

Hinges & pulls

Soft-close hinges and decorative pulls. A pull for every front, two hinges for every door.

Install It KitLearn more →
03

Box paint

Enough paint for your boxes and a marker for every color. Paint Ready fronts ship primed for the color you choose.

Refinish It KitLearn more →
04

Jigs & instructions

Locator jigs that line up every pull and hinge, the screws, and step-by-step instructions with a QR code to the videos.

Install It KitLearn more →

Every front is labeled to its cabinet. Match the number and hang it.

Installation day

Four steps, one screwdriver,one weekend.

No demolition. No dumpster. No strangers in your house for three weeks. The boxes stay where they are — everything you actually look at gets replaced.

A kitchen mid-install: doors off and boxes freshly painted, new fronts leaning against the wall, hinges and a screwdriver laid out on a drop cloth.Installation day
01

Remove

Unscrew the hinges and lift. The boxes never move and the kitchen stays usable.

About an hour
02

Refresh

Fill the old screw holes, two coats on the frames, and the boxes disappear into the new doors.

An afternoon
03

Replace

Every front is labeled to its cabinet with the hinge holes bored. Match the number, four screws.

Two to three hours
04

Finish it

Clamp the jig, drill, mount. Dead level, dead centered, no tape measure.

About an hour

That’s the whole job. Friday night to Sunday afternoon, and the only tool that matters is a screwdriver.

Your move

Your number isone minute away.